Difference between revisions of "2024 AMC 10A Problems/Problem 8"
Khizarrouf (talk | contribs) (→Video Solution 7 by TheNeuralMathAcademy) |
Khizarrouf (talk | contribs) |
||
Line 55: | Line 55: | ||
== Video Solution 8 by TheNeuralMathAcademy == | == Video Solution 8 by TheNeuralMathAcademy == | ||
https://www.youtube.com/watch?v=4b_YLnyegtw&t=1176s | https://www.youtube.com/watch?v=4b_YLnyegtw&t=1176s | ||
+ | |||
+ | == Video solution by TheNeuralMathAcademy == | ||
+ | https://www.youtube.com/watch?v=4b_YLnyegtw&t=1547s | ||
+ | |||
+ | ==See Also== | ||
+ | {{AMC10 box|year=2024|ab=A|before=[[2023 AMC 10B Problems]]|after=[[2024 AMC 10B Problems]]}} | ||
+ | * [[AMC 10]] | ||
+ | * [[AMC 10 Problems and Solutions]] | ||
+ | * [[Mathematics competitions]] | ||
+ | * [[Mathematics competition resources]] | ||
+ | {{MAA Notice}} |
Revision as of 17:11, 18 August 2025
Contents
- 1 Problem
- 2 Solution 1
- 3 Solution 2
- 4 Video Solution 1
- 5 Video Solution 2 by Power Solve
- 6 Video Solution 3 by Daily Dose of Math
- 7 Video Solution 4 by SpreadTheMathLove
- 8 Video Solution 5 by Pi Academy
- 9 Video Solution 6 by Dr. David
- 10 Video Solution 7 by Easy Way
- 11 Video Solution 8 by TheNeuralMathAcademy
- 12 Video solution by TheNeuralMathAcademy
- 13 See Also
Problem
Amy, Bomani, Charlie, and Daria work in a chocolate factory. On Monday Amy, Bomani, and Charlie started working at and were able to pack
,
, and
packages, respectively, every
minutes. At some later time, Daria joined the group, and Daria was able to pack
packages every
minutes. Together, they finished packing
packages at exactly
. At what time did Daria join the group?
Solution 1
Note that Amy, Bomani, and Charlie pack a total of packages every
minutes.
The total amount of time worked is hour and
minutes, which when converted to minutes, is
minutes. This means that since Amy, Bomani, and Charlie worked for the entire
minutes, they in total packed
packages.
Since packages were packed in total, then Daria must have packed
packages in total, and since she packs at a rate of
packages per
minutes, then Daria worked for
minutes, therefore Daria joined
minutes before
PM, which was at
~Tacos_are_yummy_1, andliu766
Solution 2
Let the time, in minutes, elapsed between and the time Daria joined the packaging be
. Since Amy packages
packages every
minutes, she packages
packages per minute. Similarly, we can see that both Bomani and Charlie package
package per minute, and Daria packages
packages every minute.
Before Daria arrives, we can write the total packages packaged as . Since there are
minutes between
and
, Daria works with the other three for
minutes, meaning for that time there are
packages packaged.
Adding the two, we get (The total packaged in the entire time is
). Solving this equation, we get
, meaning Daria arrived
minutes after
, meaning the answer is
.
~i_am_suk_at_math_2
Video Solution 1
Video Solution 2 by Power Solve
https://youtu.be/j-37jvqzhrg?si=bf4iiXH4E9NM65v8&t=996
Video Solution 3 by Daily Dose of Math
Video Solution 4 by SpreadTheMathLove
https://www.youtube.com/watch?v=_o5zagJVe1U
Video Solution 5 by Pi Academy
https://youtu.be/6qYaJsgqkbs?si=K2Ebwqg-Ro8Yqoiv
Video Solution 6 by Dr. David
Video Solution 7 by Easy Way
~KENJAKURA
Video Solution 8 by TheNeuralMathAcademy
https://www.youtube.com/watch?v=4b_YLnyegtw&t=1176s
Video solution by TheNeuralMathAcademy
https://www.youtube.com/watch?v=4b_YLnyegtw&t=1547s
See Also
2024 AMC 10A (Problems • Answer Key • Resources) | ||
Preceded by 2023 AMC 10B Problems |
Followed by 2024 AMC 10B Problems | |
1 • 2 • 3 • 4 • 5 • 6 • 7 • 8 • 9 • 10 • 11 • 12 • 13 • 14 • 15 • 16 • 17 • 18 • 19 • 20 • 21 • 22 • 23 • 24 • 25 | ||
All AMC 10 Problems and Solutions |
These problems are copyrighted © by the Mathematical Association of America, as part of the American Mathematics Competitions.